Scouts get creative with KNEX
The start of the New Year saw Scouts get creative with KNEX.
The brief was to build a single span bridge – to be load tested to destruction, then to build the highest structure and finally to build an abstract structure of their choosing.
A lot of thought and effort went into the designs – well done Scouts!